RD 2177/2004, UNE-EN 12811 and CE marking: the documentation your scaffolding company must hand over before anyone steps onto the platform.
Regulations
What Spanish regulations require of a scaffold on site
A scaffold is not handed over until there is paperwork to back it up. Spanish regulation starts with Royal Decree 2177/2004, which governs temporary work at height, and rests on the UNE-EN 12810 and 12811 standards for the design and testing of the systems.
The minimum documentation
Before first use you should have: the CE marking certificate for the material, an assembly plan whenever the configuration is not a standard build, and a handover record signed by the competent person who supervised the assembly.
On top of that come the periodic inspections and those following any incident: a storm, a knock from machinery or a modification to the scaffold all require an inspection before it is used again.
Who signs what
The assembly is supervised by someone with specific training. The use plan, where required, is signed by a qualified engineer. And the project management team receives a copy of everything before authorising the works.
At Celi Estructuras that folder is handed over complete on the day the scaffold enters service, without the client having to ask for it.