Gran Vía refurbishment
Frame scaffolding + walkway protection
Technical challenge
A listed facade with continuous pedestrian traffic beneath the scaffold and very restricted loading hours.
Solution applied
Assembly in night-time phases, a lit pedestrian canopy and a specific assembly plan for occupying the public highway.